Optimized route building 

AntsRoute considers various logistics factors to build the most efficient routes.

Start your free trial ➝      Book a demo ➝

 Free 14-day trial      No credit card required

route building

Optimized route building

AntsRoute considers various logistics factors to build the most efficient routes.

Start your free trial ➝

Book a demo ➝

route building

An approach to ensure the most efficient routes

route building

An approach to ensure the most efficient routes

Determine skills and capacities available

The smart appointment scheduling module determines if skills are available for each order.

Create point cloud of orders

The software creates a logical point cloud of orders which makes sure routes building plays its full role.

Ensure geographical coherence

AntsRoute also ensures the geographical coherence regarding customer expectations.

Determine schedules of drivers

Schedules of drivers and technicians are determined during the routes building and not before.

Discover the elements factoring in the route building

Discover the elements factoring in the route building

route building

All the factors regarding the orders

All the factors regarding the orders

  Type of order,
 Address,
  Required skills to perform a visit,
  Required material to perform a visit,
 Date and time slot,
 Duration of visit

route building

All the factors regarding the purpose of deliveries or operations

All the factors regarding the purpose of deliveries or operations

 Address of delivery, pick-up or visit
 Date and time slot,
 Type of transport (living, solid, liquid),
 Capacity (weight, volume, material,…),
 Maximum transport duration,
  Duration of delivery, pick-up or visit

route building

route building

route building

All the factors regarding drivers and field workers

All the factors regarding drivers and field workers

  Working hours,
 Skills and licenses,
 Absences,
 Departure and arrival addresses,
 Duration of breaks

route building

All the factors regarding the vehicles

All the factors regarding the vehicles

  Type of vehicle,
  Gross vehicle weight rating,
 Volume,
 Equipment of vehicle,
  Operational costs,
  Type of contrat (owner / long-term rental),
 Driving objectives,
  Availabilities 

route building

route building

route building

All the factors regarding the traffic conditions

All the factors regarding the traffic conditions

  Usual congestion areas
  Constraints of heavy goods vehicle,
 Topography,
  Weather

route building

15,000+ routes optimized each month by these companies which have chosen the route optimization software AntsRoute to grow

All the factors regarding electric vehicles which are integrated in the route building

All the factors regarding electric vehicles which are integrated in the route building

route building

Electric vehicles
 Battery life,
  Type and power of recharge,
 Technical features

route building

Affiliate building
  Building consumption,
  Power subscribed and the pricing conditions of the energy contract

route building

Charging stations
  Power,
  Availability,
 Cluster management

The objectives of the delivery and operation route building

Objectives of the delivery and operation route building

The AntsRoute route building software considers the travel time and distance and ensure your current field workers are used to their maximum potential. Furthermore, routes are built to meet secondary objectives and integrate logistics constraints.

The objective focusing on the fleet

The objective focusing on the fleet

route building

01. Respect driving objectives

The objective can be to prioritize the use of low-emissions vehicles. Thus, routes are built considering necessary power and battery life of vehicles.

route building

02. Cut down fleet costs

An other objective can be to reduce the total costs of vehicles: TCO for vehicle, TCO for fleet, TCO for drivers.

The objective focusing on the resources

The objective focusing on the resources

route building

01. Create routes with balanced working time

The objective can be to assign deliveries and operations to the different field workers ensuring their schedules are balanced in terms of work time.

route building

02. Create routes with balanced travel time 

An other objective can be to assign deliveries and operations to the different field workers ensuring their schedules are balanced in terms of travel time.

route building

03. Maximize the number of orders per route

The last objective can be to maximize the number of orders carried out during a same route to limit the number of field workers necessary.

ENJOY FREE 14-DAY TRIAL

Grow your business with AntsRoute

  Free 14-day trial    No credit card required  Easy setup

Free 14-day trial ➝      Book a demo ➝